1·The construction measures and quality management of cast in-situ piling pile and the problems to be fully noted in construction procedures were discussed.
本文就钻孔灌注桩的施工措施、质量管理及施工环节中应充分重视的问题进行了探讨。
2·Then new tasks and conditions start piling up and before you know it - you are buried under a pile of clutter, deadlines and constant burnout.
然后新的任务和情况又不断堆叠,在你意识到他们之前,你已经被埋到了一堆堆的杂务、最后期限和精疲力竭之中。
3·Pile driving speed, the average 3 minutes can realize piling 6 meters deep, namely a hole three minutes to play.
打桩速度快,平均3分钟可实现打桩6米深,即3分钟可打一个孔。
4·A tower crane foundation basement project should take measures in particular: such as piling in foundation, and pile reinforcement and foundation anchor bolts end firmly welded together.
有地下室工程的塔吊基础还要采取特别的处理措施:如在基础下打桩,并将桩端的钢筋与基础地脚螺栓牢固的焊接在一起。
5·Pile top deviation due to piling and excavation on saturated soft soil foundation is usually an engineering disease.
在饱和软粘土地基上打桩挖土造成桩顶偏移的情况,是累见不鲜的工程病害。
6·In this paper, based JCCAD software design parameters of pile caps changes, After the upper structure to solve piling centroid centroid do not coincide with the pile when the pile cap computation.
本文利用基础JC CAD软件承台桩设计参数的修改,解决补桩后上部结构形心与桩基形心不重合时桩基承台的计算问题。
7·After testing pile and determining the load bearing capacity of single pile, the single piling method is adopted for construction.
采用沉管灌注桩法处理软土地基,经试桩并确定单桩承载力后,采用单打法进行施工。
8·The mechanism of piling into rocks of steel pipe pile ', earth blockage and type selection of pile toe are discussed.
文章讨论了钢管桩在基岩中的沉桩机理、土塞问题和钢管桩桩端的选型。
9·The piling technology of thin -wall steel sheet pile on water is discussed combining with an engineering case.
结合工程实例,介绍水上施打薄壁钢板桩的施工工艺。
10·According to the graphics of some static loading tests, it explains the strengthening effects of the rigid pile composite foundation and briefly introduces piling technology of rigid pile.
根据数项工程实例和静载试验结果说明加固效果,并简单介绍刚性桩成桩工艺。